Home What we do Projects Bangalore Water Supply and Sewerage Project –Phase II. Stage IV – Bangalore
Bangalore Water Supply and Sewerage Project –Phase II. Stage IV – Bangalore
Client & Sector
- BWSSB
- Project Length : Mar’07 to Jul’ 14 (Extended & completed in July 2018)
- Funding : JICA
Service
- Project Management Consultancy Services
- SCADA & NRW Services
Region
- Location : Bangalore
- Country : India

Project Scope
Project Consists of detailed Design / Engineering / Procurement / Bid document Preparation for each package / Evaluation & Assist in selection of Contractors/ Project Management with Construction Supervision /Liasioning with JICA & BWSSB, Bangalore
Project Service
- Preparation of Design Review Report (DRR) / Detailed Project Report (DPR)
- Design and Detailed Engineering including Process and Hydraulic Design
- Detailed design, preparation of bids, estimates ,evaluation & assist in contractor selection,
- Design reviews & construction supervision for
- New WTP of 500 MLD capacity with Advance treatment processes,
- 3 large pumping stations to pump treated water to 100 Kms and 400 Mts
- Laying of trunk sewerage – 400 to 2400 mm diameter for 49.7 Kms.
- Pumping mains – 400 to 1000 mm – for 29.7 Kms
- 10 no of STPs with SCADA with a combined capacity of 403 MLD
- 6 sewage pumping stations with SCADA with 208 cum/hr to 2100 cum/hr with varying head of 22 to 51 m.
- UFW reduction and Slum Development
- MIS and Asset Management

View More Project Images




Our Project Expert

Dr. Uday Kelkar
Water/Wastewater Treatment Process Specialist

Dr. Yogeshwar Gokhale
Sewage Treatment Process Specialist

Pradipto Sarkar
NRW and Contract Specialist

Nizamuddin Ahmed
Instrumentation Specilist